BIOMASS TO CRYPTO MINING

Location: Municipality of Mostardas, State of Rio Grande do Sul, Brazil.

The project starts with an adult Forest of Southern Yellow Pine – Pinus Elliottii 500 Hectares with sufficient stock for 4 years of production of a biomass plant with capacity to generate 2MWe per hour. 

4 yrs is the time required for reforestation with Bamboo. By applying cutting-edge technology, we will optimize and enhance energy generation with a target of +/- 100 MWe *. On a 500 Hectares fully grown field of Beema Bamboo. 

With the profit generated from the sale of wooden products and news funds, we will target to continue with the investment in subsequent phases, which will include the planting of 50 million Beema Bamboo seedlings on 15,000 hectares in the vicinity. Beema is a hybrid, non-invasive bamboo variety produced in the laboratory using tissue culture. This bamboo clone produces approximately 150 tons of biomass per hectare annually perennially. Guarantees renewable and sustainable biomass for expanding energy generation capacity.

Target after 5 years to have everything planted and generate 100 MegaWatt per hour. Dedicated to mining. In 10 yrs shall have included Solar panel and wind turbines expansion up to 200MWe and in 20yrs all 15,000 hectares planted, Greater perfomance of wind turbines up to 500Mwe and generate in total 2 GigaWatts per hour. Largest combined power generation project in the world. Biomass / Wind / Solar

Strategic Alliances:

ANKUR (India): Gasification technology.

WEG-TGM (Brazil): Equipment for generators, engines, turbines, boilers., Wind turbine and Solar.

GROWMORE BIOTECH LTD. (India): Bamboo cultivar research.

BITMAIN – bitmain.com/

Bitcoin Miner S21e XP Hyd

ANTSPACE MD5

What does it mean to have 100MWe power plant running Bitmain equipments? The answer is this video below:

SEE WHAT ALREADY EXISTS IN OTHER COUNTRIES:

Minimum Initial investment and guarantees: US$ 15 million (equipment purchases, instalations…). A fast track calculation after 5 years producing 2MWe and reinvesting to reach 10MWe= Then after 5 years a total of 1,700 S21e XP Hyd. = generating at least US$ 25/ profit per day. Adds to 350 days a year (less maintanance) a business model that could generate US$ 15 million. In less than 5 years all investment is paid and profit will be generous…